
Representative image. Not Center One.
20 MW of hydro power connected today🇨🇦 Québec, Canada
Québec
20 MW of hydro power connected today
AI/HPC conversion planned

Sovereign AI compute · Powered by hydro
20 MW of hydro power connected in Québec to serve North America.
Bhutan: sovereign AI project for India, up to 100 MW under a non-binding LOI.

Representative image: a data-center corridor. Not a SATO site.
Representative image: graphics cards. Not SATO hardware.
of responsible AI
Where we operate

Montmorency Falls, Québec. Representative footage, not a SATO or Hydro-Québec site.
Québec
20 MW of hydro power connected in Québec to serve North America. A sovereign AI project for India — up to 100 MW under a non-binding LOI.


Representative image. Not Center One.
20 MW of hydro power connected today🇨🇦 Québec, Canada
20 MW of hydro power connected today
AI/HPC conversion planned

Paro, Bhutan. Not the project site.
Non-binding LOI, July 2026🇧🇹 Bhutan
Non-binding LOI, July 2026
Up to 100 MW, potential path to 500 MW
Qritical.ai

Qritical.ai, operated by SATO's wholly owned subsidiary Qritical AI Inc., offers GPU compute by the hour.
Visit Qritical.aiRepresentative footage: server drive bays. Not Qritical.ai hardware.
Solutions
01
GPU compute by the hour, offered by Qritical.ai, SATO's wholly owned subsidiary.
02
High-performance computing is part of the planned AI conversion at the Québec site.
03
SATO has operated Center One (Québec) since 2017, with 20 MW of hydro power connected today.
TSXV: SATOOTCQB: CCPUF
Listed on the TSX Venture Exchange since 2021 and on the OTCQB since 2022.
Investor relationsNewsroom